| EUROPA > EUR-Lex > ID celex

32003A1211(01)


Title and reference

Commission opinion of 10 December 2003 concerning the plan for the disposal of radioactive waste arising from the decommissioning and complete dismantling of the research reactor TRIGA HD II and the complete dismantling of the decommissioned and safe-state research reactor TRIGA HD I at Heidelberg in Baden-Württemberg in the Federal Republic of Germany, in accordance with Article 37 of the Euratom Treaty

 Official Journal C 300 , 11/12/2003 P. 0008 - 0008

 DA  DE  EL  EN  ES  FI  FR  IT  NL  PT  SV

Text

ES CS DA DE ET EL EN FR IT LV LT HU MT NL PL PT SK SL FI SV
html   html html   html html html html         html   html     html html
pdf   pdf pdf   pdf pdf pdf pdf         pdf   pdf     pdf pdf

Authentic language

Dates

Classifications

Miscellaneous information

Relationship between documents

Text

Bilingual display : DA DE EL EN ES FI FR IT NL PT SV

Commission opinion

of 10 December 2003

concerning the plan for the disposal of radioactive waste arising from the decommissioning and complete dismantling of the research reactor TRIGA HD II and the complete dismantling of the decommissioned and safe-state research reactor TRIGA HD I at Heidelberg in Baden-Württemberg in the Federal Republic of Germany, in accordance with Article 37 of the Euratom Treaty

(2003/C 300/04)

(Only the German text is authentic)

On 6 June 2003, the European Commission received from the German Government, in accordance with Article 37 of the Euratom Treaty, General Data relating to the plan for the disposal of radioactive waste arising from the decommissioning and complete dismantling of the research reactor TRIGA HD II and the complete dismantling of the decommissioned and safe-state research reactor TRIGA HD I at Heidelberg.

On the basis of these data and additional information provided by the German Government on 24 September 2003, and following consultation with the group of experts, the Commission has drawn up the following opinion:

(a) The distance between the plant and the nearest point on the territory of another Member State is approximately 80 km to France.

(b) Under normal operating conditions, the discharges of liquid and gaseous effluents will not cause an exposure of the population in other Member States that is significant from the point of view of health.

(c) Solid radioactive waste arising from the dismantling operations will be transferred to the regional collection point for radioactive waste at the FZK Karlsruhe. Non-radioactive solid waste or residual materials and materials which are released from regulatory control will be released for disposal as conventional waste or for reuse or recycling. This will be done in compliance with the criteria laid down in the Basic Safety Standards (Directive 96/29/Euratom).

(d) In the event of unplanned discharges of radioactive waste, which may follow an accident of the type and magnitude considered in the General Data, the doses likely to be received by the population in other Member States would not be significant from the point of view of health.

In conclusion, the Commission is of the opinion that the implementation of the plan for the disposal of radioactive waste in whatever form arising from the decommissioning and complete dismantling of the research reactor TRIGA HD II and the complete dismantling of the decommissioned and safe-state research reactor TRIGA HD I at Heidelberg in Baden-Württemberg in the Federal Republic of Germany, both in normal operation and in the event of an accident of the type and magnitude considered in the General Data, is not liable to result in the radioactive contamination, significant from the point of view of health, of the water, soil or airspace of another Member State.

Top